Ozora Energy, as the Head Subcontractor, played a pivotal role in executing this intricate project. We deployed the 5B Maverick solution, which offered a low-to-the-ground, prefabricated, and pre-wired configuration with high energy density—perfect for the Happy Valley site. The ballasted nature of the 5B Maverick system minimised ground penetration, eliminating the need for drilling or piling into the bedrock, which would have increased costs and complexity.
The prefabricated nature of the system not only accelerated deployment but also minimised on-site waste and improved safety by reducing the amount of construction material stored on-site. Its low profile was also appreciated by local residents, as it had a minimal impact on their views.